How it works

Clear roles, agreed in writing.

We handle discovery, qualification and coordination. Manufacturers build. Engineers assess. You decide. Here is how each side works with us.

The process

Five steps from requirement to proposal.

Tell us the requirement

The machine or fleet, new equipment or a retrofit, the duty cycle, the site and the timing.

You

We map the suppliers

A longlist, then a shortlist of Chinese makers that build what you need, with their products and specifications side by side.

Shenzhen

We check them

Legal entity, factory, product documents, reference projects and export experience, asked for as evidence rather than taken from a brochure.

China

We set up the conversation

Introductions, meetings, factory visits, and first prices and lead times collected from the suppliers.

Both sides

Your engineers decide

Suitability, safety and certification are confirmed by your technical team and the supplier's engineers, never by us.

Your team

For operators

A sourcing brief, scoped up front.

When you need suppliers found and compared for a defined requirement, we agree the scope, deliverables and fee in writing before we start. A typical brief covers:

  • Clarifying the requirement with your team
  • A supplier longlist and shortlist
  • Product and specification comparison
  • First prices and lead times from the suppliers
  • Introductions, meetings and factory visits

Retrofit

For a conversion, start with your data.

A retrofit conversation starts with the fleet, not a sales pitch. The more of this you can share, the faster a qualified provider can say whether it makes sense:

  • Machine make, model and year
  • Number of machines in the fleet
  • Current engine and drivetrain
  • Payload and operating weight
  • Engine hours and annual operating hours
  • Duty cycle and shift pattern
  • Haul distance, gradient and road condition
  • Fuel use per hour or shift
  • Site altitude and temperature range
  • Charging access and available electrical capacity
  • Workshop and maintenance capability
  • Timeline and how the decision is made

For manufacturers

Evidence first, then buyers.

Before we put a supplier in front of a buyer, we ask for proof. Brochures and verbal claims are a start, not the check. We ask for:

  • Registered company and business licence
  • Factory address and what is made there
  • Catalogue with exact model numbers
  • Payload, power, battery capacity and operating limits
  • Deployed machines and customer references
  • Export countries and test reports for target markets
  • Warranty terms, spare parts and service support
  • Battery chemistry, BMS and charging interface
  • Who owns retrofit engineering and validation
  • Existing distributors or agents, by country

How we work

Plain commercial rules.

  • Terms before introductions. Fees or commission, and how leads are registered, are agreed in writing before we share anyone's details.
  • Disclosed both ways. If we are paid by the buyer and the supplier, both of them know.
  • Direct contracts. You contract with the manufacturer. We don't take title to equipment or hold your payments.
  • No engineering promises. Design, safety, installation and certification belong to qualified engineers, set out in the contracts.
  • Facts kept separate. We label what is verified, what is a manufacturer's claim and what is not yet tested.

Ready to start?

Operators send a requirement. Manufacturers introduce their products. We take it from there.